--- slug: trabalho-em-altura-nr35 lang: en titulo: Work at height starts above 2 meters and requires 8 hours of training resposta: Under Brazil's NR-35, work at height is any activity above 2.00 m from the lower level with a risk of falling. It requires theoretical and practical training of at least 8 hours, renewed every two years. curto: Work at height: NR-35 in numbers tema: Occupational safety revisada: 2026-10-01 proxima: 2027-04-01 --- ## Data | Indicator | Value | Unit | Source | Data date | |---|---|---|---|---| | Reference height for work at height | 2.00 | meters above the lower level | NR-35, item 35.1.2 | 2018 text | | Minimum hours of initial training | 8 | hours, theoretical and practical | NR-35, item 35.3.2 | 2018 text | | Frequency of periodic training | 2 | years (biennial) | NR-35, item 35.3.3 | 2018 text | | Hours of periodic training | 8 | hours | Work at Height Booklet, Ministry of Labor | 27/07/2018 | | Hours of event-driven training | not fixed | depends on the situation that triggered it | NR-35 Manual, Ministry of Labor | April 2018 | Data consulted on 2026-10-01. ## Basis - [Manual for interpreting and applying NR-35, 2nd edition (Ministry of Labor, in Portuguese)](https://www.gov.br/trabalho-e-emprego/pt-br/assuntos/inspecao-do-trabalho/manuais-e-publicacoes/2020/manual_consolidado_da_nr_35.pdf): reproduces and comments items 35.1.2, 35.3.2 and 35.3.3 of NR-35. - [Work at Height Booklet (Ministry of Labor, in Portuguese)](https://www.gov.br/trabalho-e-emprego/pt-br/assuntos/inspecao-do-trabalho/manuais-e-publicacoes/2020/cartilha_trabalho_em_altura.pdf): explains the scope of NR-35 and the hours of initial and periodic training. ## How it applies Before any job more than 2.00 m above the lower level with a risk of falling, the employer checks that each worker has the 8-hour initial training. Periodic training repeats every two years. Event-driven training applies when procedures, conditions or operations change, among other cases in item 35.3.3. Getting to and leaving the work position is also covered by the standard. ## Limits - The texts read date from 2018; the current wording of NR-35 must be checked with the Ministry of Labor before any decision. - The booklet clarifies that work above 2.0 m in which collective protection measures remove the risk of falling, during the task and on access, is not covered by NR-35. - This sheet does not replace the site risk analysis or the advice of the safety professional in charge.