← Back to the home page
CS Engenharia · Legal Document

Português · English · Español

Terms of Use.

Last updated: October 4, 2026. These rules apply to the use of the ces.eng.br website. By browsing it, you accept them. If you disagree with any of them, the way out is simple: do not use the site. To learn how we handle personal data, read the Privacy Policy.

1. Who we are and what this site is

CS Engenharia (Construction, Engineering and Consulting) is part of the InnCorporate group, alongside InnovaSphere and InnovaPeople. It carries out the full cycle of a construction project for medium and large developments, mainly in the MATOPIBA region. This site presents the company, publishes articles and technical sheets, and offers a contact form. It is available in Portuguese, English and Spanish.

2. Informational nature

The content of the site is informational and institutional. It is not a commercial proposal, a binding offer, a guarantee of execution or formal consulting. Estimates and technical proposals exist only in a document of their own, prepared after analysing the scope of each case and accepted in writing by the parties. Sending the form, exchanging messages or reading a page does not create a contract.

3. Articles, technical sheets and references

The Insights articles and the Atlas sheets explain construction topics in accessible language. They help start a conversation and do not replace a design, a report, a technical responsibility record (ART), a field inspection or the opinion of a professional qualified for your case. Standards, laws and deadlines change. When an article cites a law or standard, the version in force published by the official body always prevails. Before deciding anything important, check the source and talk to us or to your technical lead.

4. Contact and confidentiality

What you send us through the form, by e-mail or by WhatsApp is treated as confidential. We do not disclose it to third parties without your authorization, except for legal obligations and the sharing described in the Privacy Policy. We ask for the same care with the technical material we send you: proposals, diagnostics and dossiers must not be passed to third parties without express authorization.

5. Intellectual property

The brand, logotype, texts, visual design and organization of this site belong to CS Engenharia and the InnCorporate group and are protected by applicable law. You are free to read, to share the address of a page and to quote short passages with a clear indication of the source. Copying, reproducing or adapting the content for another use requires prior written authorization.

The reference photographs that illustrate the site have their own licences, from various authors, and the company's own are for its own use. The author and licence of each image are in the image credits table, and that licence remains in force even if the page is copied.

6. Links to other addresses

The site links to third-party pages (social networks, public bodies, cited sources) and to sites of group companies. The Restricted Area leads to a separate platform, with access by your own credentials and its own rules. We do not control the content or the privacy practices of those addresses, and a link does not mean we agree with everything on them.

7. Proper use

You agree to use the site in good faith. It is forbidden to:

8. Availability

We work to keep the site online, but it may be unavailable because of maintenance, failure of third-party services or reasons beyond our control. We may also change or remove pages at any time, without prior notice.

9. Limits of liability

We take care that the information is correct and current, but we do not guarantee that it is complete or free of error. CS Engenharia is not liable for decisions made solely on the basis of the site's content, nor for damage arising from third-party failures, connection interruptions or use of the site contrary to these terms, to the extent the law allows such liability to be limited. Nothing here removes rights the law gives you.

10. Governing law and venue

These terms are governed by Brazilian law. The courts of the competent district in the State of Bahia are chosen to hear matters arising from them, unless the law provides otherwise.

11. Changes

We may revise these terms. The version in force is always the one published on this page, with the update date at the top. Continuing to use the site after a change means accepting the new text.

12. Contact

Questions about these terms: contato@ces.eng.br.

← Back to the home page